STEM Prequalification Apps

NOTICE:  Prequalification has closed. No additional applications are being accepted.


If you are a prequalified contractor, follow the link located on the right side of the page for Prequalified Contractors.


stem01-opt

Garrett College STEM Facility

In the Spring of 2017, Garrett College will begin construction of a state of the art STEM Facility. This new Science, Technology, Engineering and Math Facility will provide classrooms, science and engineering labs, staff offices, and student spaces on the main campus in McHenry. Planned opening of the facility is Fall 2018.



Download 1
Application (1 MB)
Download 2
Prequalification Drawings (15 MB)
Download 3
LEED Scorecard (1 MB)
Download 4
Pre-Construction Bid Opening(38 KB)
 


Please submit submissions / questions to 
This email address is being protected from spambots. You need JavaScript enabled to view it.